45
NRG 26-61 - Installation & Operating Manual -
819874-00
Bringing into service
Manually initiating a display test
Pay attention to the setting instructions on page 39 and proceed as follows:
1.
Select the parameter “
diSP
”.
2.
Press and hold the rotary knob until the display test starts and shows “
....
”.
3.
The following numbers and decimal points run across the display from right to left:
“...., 1, 2, 3, 4, 5, 6, 7, 8, 9, ....”
4.
Check that all numbers and decimal points are displayed correctly.
The display test runs automatically until it has finished, and cannot be interrupted.
5.
The display test ends with “
donE
”.
Replacing faulty equipment
Faulty equipment jeopardises plant safety.
■
■
If numbers or decimal points are displayed incorrectly or not at all, you must replace the
level electrode with an identical one from GESTRA AG.
Activating URB 2 compatibility “ConP”
For operation with SPECTORconnect, do not change setting (ConP = oFF).
1.
Select the parameter “
ConP
”.
2.
Press and hold the rotary knob until the current status flashes on the display.
3.
Set the required status (off / on).
ConP
=
on
:
This enables the higher-resolution NRG 26-61 readings to be displayed on the
URB 2 operating terminal. (by converting from 16 bit to 10 bit)
ConP = oFF:
16-bit resolution of the NRG 26-61 readings.
4.
Save your setting by pressing the rotary knob for approx. 1 second.