
8
Chapter 2:
Installation
Please unpack the plotter boxes and inventory the contents before you begin to
assemble the plotter. Follow these instructions to install the GSx
plus
plotter to any
OMEGA. Installation of the GSx
plus
to other sign design systems is described
separately.
Note: Should you experience difficulty during installation of the GSx
plus
to the
OMEGA system, contact Gerber Field Service Department at 800-828-5406.
Plotter Work Area
1
Carefully remove the GSx
plus
from its packaging materials and place it
near the OMEGA system. The cable is 10 feet (3.1 meters) long, so the
plotter need not be located immediately beside the console; however, it
should be close enough so there will be no strain on the cable after
installation.
2
Place the material roll holder next to the plotter on the right side.
Summary of Contents for GSx Plus
Page 1: ...GSxplus USER S MANUAL...
Page 55: ......
Page 58: ...Z Z axis tool height adjustment 42...
Page 60: ......