20
4.6. Leak test
After installation it is necessary to check that the entire water installation is tight.
This is accomplished by performing a water leak test.
4.7. Commissioning of the water circuit
Fill the water tank via the cold water connecting branch. Deaerate the water tank by
opening one of the hot water taps located at the highest level until air no longer
appears at the tapping point.
A few days after the initial setup and start-up, check the installation for leaks in
the water installation or blockage of the condensate drain.
Summary of Contents for VANVEX R +
Page 1: ...VANVEX R VANVEX RS Domestic hot water heat pump OE04 956 1807 MANUAL...
Page 2: ...2...
Page 50: ...50...
Page 51: ...51...