16
3.1. Set-up sequence
Once the unit is placed in a room with characteristics as specified in the previous
paragraph, then it can be prepared following the sequence described below:
1. Remove the packaging from the pallet.
2. Remove the transport fittings from the pallet.
3. Remove the unit off the pallet and place it on the floor.
4. Adjust the unit vertically by adjusting the feet.
5. Check that the unit has no damages.
6. Set-up the water circuit (See chapter 4) and fill the tank with water.
7. Set-up the air circuit (See chapter 5).
8. Set-up the electric connections (See chapter 6).
When the unit is supplied with electricity, it automatically starts running in its
standard operation according to the factory settings as described in Chapter 7.
Figure 10 - Set-up sequence
Summary of Contents for VANVEX R +
Page 1: ...VANVEX R VANVEX RS Domestic hot water heat pump OE04 956 1807 MANUAL...
Page 2: ...2...
Page 50: ...50...
Page 51: ...51...