Service Manual
September 2016
Checklist B Procedures
12
Super Tower
Part No. 115411
Checkl ist B Procedur es
B-1 Ins pect All W elds
B-1
Inspect All Welds
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Weld inspections are essential to safe machine
operation and good machine performance. Failure
to locate and repair damage may result in an
unsafe operating condition.
1
Visually inspect the welds in the following
locations:
•
Winch mounting plate
•
Loading wheels/steer handle
•
Base
•
Legs and stabilizers
•
Load handling attachment(s)
B-2 Cl ean the C olum ns
B-2
Clean the Columns
Genie requires that this procedure be performed
every 250 hours or quarterly, whichever comes
first.
Clean columns are essential to good machine
performance and safe operation. Extremely dirty
conditions may require that the columns be
cleaned more often.
1
Raise all columns to full height.
2
Visually inspect the inner and outer channels
of the columns for debris or foreign material. If
necessary, use a mild cleaning solvent to
clean the columns.
Bodily injury hazard. This
procedure will require the use of
additional access equipment.
Do not place ladders or scaffold
on or against any part of the
machine. Performing this
procedure without the proper
skills and tools could result in
death or serious injury. Dealer
service is strongly
recommended.
Summary of Contents for Super Tower
Page 13: ...September 2016 Service Manual Part No 115411 Super Tower 5 This page intentionally left blank ...
Page 15: ...September 2016 Service Manual Part No 115411 Super Tower 7 This page intentionally left blank ...
Page 17: ...September 2016 Service Manual Part No 115411 Super Tower 9 This page intentionally left blank ...
Page 45: ......