October 2016
Service and Repair Manual
Boom Components
Part No. 1268558
ZX-135/70
65
17 Use a soft metal drift to tap the pin halfway out
and lower one of the linkage arms down. Tap
the pin in the other direction and lower the
other linkage arm down.
Crushing hazard. The upper
primary boom lift cylinder linkage
arms could fall if not properly
supported when the pivot pins are
removed.
18 Attach a 5 ton / 5000 kg overhead crane to
both ends of the primary boom. Do not apply
any lifting pressure.
19 Remove the pin retaining fasteners from the
primary boom pivot pins.
20 Use a soft metal drift to remove the primary
boom pivot pins.
21 Carefully remove the primary boom from the
machine and place it on a structure capable of
supporting it.
Crushing hazard. The primary
boom could become unbalanced
and fall when removed from the
machine if not properly attached
to the overhead crane.
4-4
Primary Boom Lift Cylinder
The primary boom lift cylinder raises and lowers the
primary boom. The primary boom lift cylinder is
equipped with a counterbalance valve to prevent
movement in the event of a hydraulic line failure.
How to Remove the Primary
Boom Lift Cylinder
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these skills
and tools could result in death or
serious injury and significant
component damage. Dealer
service is strongly recommended.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
Note: Perform this procedure with the boom in the
stowed position.
1
Remove the hose and cable clamps from the
primary boom lift cylinder.
2
Remove the cable track retaining fasteners at
the primary boom lift cylinder.
3
Place blocks under both ends of the primary
boom lift cylinder. Place another block under
the cylinder linkage arms under the primary
boom lift cylinder barrel-end pivot pin.
Summary of Contents for Genie Z13505-101
Page 12: ......
Page 121: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 109 ...
Page 123: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 111 ...
Page 129: ...October 2016 Service and Repair Manual Part No 1268558 ZX 135 70 117 ...
Page 135: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 123 ...
Page 137: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 125 ...
Page 141: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 129 ...
Page 143: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 131 ...
Page 233: ...October 2016 Service and Repair Manual 221 Perkins 1104D 44T Engine Electrical Schematic ...
Page 235: ...October 2016 Service and Repair Manual 223 Perkins 854F 34T Engine Electrical Schematic ...
Page 238: ...Service and Repair Manual October 2016 226 Perkins 854F 34T Engine Harness ...
Page 239: ...October 2016 Service and Repair Manual 227 Deutz TD2 9 Engine Electrical Schematic ...
Page 242: ...Service and Repair Manual October 2016 230 Deutz TD2 9 Engine Harness ...
Page 243: ...October 2016 Service and Repair Manual 231 Hydraulic Generator Welder Option ...
Page 246: ...Service and Repair Manual October 2016 234 Generator Wiring Schematic ...
Page 247: ...October 2016 Service and Repair Manual 235 Hydraulic Schematic to SN ZX13516H 2804 ...
Page 250: ...Service and Repair Manual October 2016 238 Hydraulic Schematic from SN ZX13516H 2805 ...
Page 253: ......