October 2016
Service and Repair Manual
Boom Components
Part No. 1268558
ZX-135/70
57
4-1
Primary Boom Cable Track
The primary boom cable track guides the cables
and hoses running up the boom. It can be repaired
link by link without removing the cables and hoses
that run through it. Removing the entire primary
boom cable track is only necessary when
performing major repairs that involve removing the
primary boom.
How to Remove the Primary
Boom Cable Track
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
Note: Perform this procedure with the machine on a
firm, level surface.
Note: Perform this procedure with the boom in the
stowed position.
1
Remove the cover from the lower jib boom
cable track.
2
Tag and disconnect the electrical connectors
inside the lower cable track.
3
Remove the hose and cable clamp retaining
fasteners from lower cable track at the pivot
end of the jib boom. Remove the clamps.
4
Pull the electrical cables out of the lower cable
track that lead to the primary boom.
Component damage hazard.
Cables can be damaged if they
are kinked or pinched.
5
Tag and disconnect the electrical connectors
from the jib boom manifold located at the
platform end of the primary extension boom.
6
Tag, disconnect and plug the two hydraulic
hoses from the jib boom manifold that lead to
the platform manifold. Cap the fittings on the
manifold.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
7
Remove the retaining fasteners from the hose
and cable guide at the platform end of the
primary boom. Remove the hose and cable
guide.
8
Tag and disconnect the electrical connector
from the limit switch on the side of the primary
boom. Do not remove the limit switch.
9
Remove the cotter pin from the upper cable
track tube at the platform end of the primary
extension boom.
Note: Always replace the cotter pin with a new one.
Summary of Contents for Genie Z13505-101
Page 12: ......
Page 121: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 109 ...
Page 123: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 111 ...
Page 129: ...October 2016 Service and Repair Manual Part No 1268558 ZX 135 70 117 ...
Page 135: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 123 ...
Page 137: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 125 ...
Page 141: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 129 ...
Page 143: ...October 2016 Service and Repair Manual Manifolds Part No 1268558 ZX 135 70 131 ...
Page 233: ...October 2016 Service and Repair Manual 221 Perkins 1104D 44T Engine Electrical Schematic ...
Page 235: ...October 2016 Service and Repair Manual 223 Perkins 854F 34T Engine Electrical Schematic ...
Page 238: ...Service and Repair Manual October 2016 226 Perkins 854F 34T Engine Harness ...
Page 239: ...October 2016 Service and Repair Manual 227 Deutz TD2 9 Engine Electrical Schematic ...
Page 242: ...Service and Repair Manual October 2016 230 Deutz TD2 9 Engine Harness ...
Page 243: ...October 2016 Service and Repair Manual 231 Hydraulic Generator Welder Option ...
Page 246: ...Service and Repair Manual October 2016 234 Generator Wiring Schematic ...
Page 247: ...October 2016 Service and Repair Manual 235 Hydraulic Schematic to SN ZX13516H 2804 ...
Page 250: ...Service and Repair Manual October 2016 238 Hydraulic Schematic from SN ZX13516H 2805 ...
Page 253: ......