+1 (800) 517-7740
3.2.3
Commissioning
After the power is applied, simply run the unit as
described in operating instructions. Look for abnormal noise,
vibration or smell.
Let the unit run continuously at full power for at least
twenty minutes. If no faults came up on the operator panel and
the unit runs smooth – your installation is complete.
Summary of Contents for Lynx 1200
Page 1: ......
Page 7: ...info generalcomponents ca 1 800 517 7740 2 PRINCIPLE OF OPERATION 2 1 Electrical Diagram...
Page 8: ...7 Lynx Rooftop 1200 1500 AC User Manual 2 2 Plumbing Diagram...
Page 12: ...11 Lynx Rooftop 1200 1500 AC User Manual...
Page 22: ...21 Lynx Rooftop 1200 1500 AC User Manual 7 PARTS LIST...