1.2.3   LOAD SHED CONTROLLER

The primary function of the Load Shed Controller (LSC) is to deter-

mine when there is excess load on the generator and has the ability 

to disconnect the non-essential loads connected to it. Excess load 

is determined by monitoring the generator supply frequency, if the 

frequency drops below 58 Hz for more than three (3) seconds, 

or below 50 Hz for 1/2 second, and the generator is considered 

to have excess load on it. When this happens, non-essential 

customer loads are disconnected. The non-essential loads are 

supplied via the load shed switch (LSS) and the LSS is actuated to 

disconnect these loads.
The non-essential loads are reconnected in one of 3 ways; Utility 

voltage is restored and ATS transfers all load back to the Utility 

supply, manual operation of LOAD SHED RESET/TEST push-button 

on the outside of the enclosure (Figure 1.2) or, automatic operation 

setup on the DIP switches on the LSC.
For manual operation, set DIP switch #6 to the ON position. If 

the generator output is overloaded and the non-essential loads 

are disconnected, press the LOAD SHED RESET push-button to 

reconnect the non-essential loads to the generator. If the overload 

condition still exists the LSC will turn the non-essential loads off.
For automatic operation, the number of attempts to reconnect the 

non-essential loads can be selected. The 2 choices are one-shot 

or repeated. The time interval before each attempt is set on DIP 

switches 1-4. For “one-shot” operation mode set DIP switch #5 to 

ON. Reconnection of the non-essential loads will occur one time, 

after the time set on DIP switches 1-4. If DIP switch #5 is OFF, 

the LSC will attempt to reconnect the non-essential loads after the 

time interval set on DIP switches 1-4. If the overload still exists or 

comes back, the LSC and LSS will disconnect non-essential loads 

and the timer and  the attempt to reconnect non-essential loads 

will be repeated. 

DIP switch num-

ber

Function

1

Selects a 5 minute reconnection time

2

Selects a 15 minute reconnection time

3

Selects a 30 minute reconnection time

4

Selects a 60 minute reconnection time

1-4 all OFF

Selects a 1 minute reconnection time

5

Selects one-shot mode

6

Selects manual reconnect only

7

Selects 50 Hz units

8

Not used

Figure 1.2

1.3    TRANSFER SWITCH DATA 

DECAL

A DATA DECAL is permanently affixed to the transfer switch enclo-

sure. Use this transfer switch only with the specific limits shown 

on the DATA DECAL and on other decals and labels that may be 

affixed to the switch. This will prevent damage to equipment and 

property.
When requesting information or ordering parts for this equipment, 

make sure to include all information from the DATA DECAL.
Record the Model and Serial numbers in the space provided below 

for future reference.

MODEL #

SERIAL #

1.4    TRANSFER SWITCH 

ENCLOSURE

The standard switch enclosure is a National Electrical 

Manufacturer’s Association (NEMA) 3R, UL listed. NEMA 3R type 

enclosures primarily provide a degree of protection against falling 

rain and sleet and is undamaged by the formation of ice on the 

enclosure.

General Information

Summary of Contents for RTSJ200A3

Page 1: ...This manual should remain with the unit Owner s Manual LTS Load Shed Switch...

Page 2: ...infor mation on tags decals and labels that may be affixed to the transfer switch Replace any decal or label that is no longer legible DANGER Connection of a generator to an electrical system normall...

Page 3: ...hazardous and possibly LETHAL electric shock DO NOT WORK ON THE TRANSFER SWITCH UNTIL ALL POWER VOLTAGE SUPPLIES TO THE SWITCH HAVE BEEN POSITIVELY TURNED OFF Competent qualified personnel should inst...

Page 4: ...will operate and disconnect the non essential loads which results in a reduction in the load on the generator The third function is a 16 circuit load center to connect the criti cal loads to These lo...

Page 5: ...switches 1 4 For one shot operation mode set DIP switch 5 to ON Reconnection of the non essential loads will occur one time after the time set on DIP switches 1 4 If DIP switch 5 is OFF the LSC will a...

Page 6: ...stalling Do not drop the switch Protect the switch against impact at all times and against construction grit and metal chips Never install a transfer switch that has been damaged This transfer switch...

Page 7: ...rals are to be connected on the busbars mounted on the load center next to the branch circuit breakers 2 6 CONNECTING CONTROL WIRES Control system interconnections consist of N1 N2 and T1 and leads 0...

Page 8: ...L position no further action is required If the handle is DOWN proceed with Step 1 Step 1 With the handle inserted into the moveable contact carrier arm move handle UP Be sure to hold on to the handle...

Page 9: ...NOW BEING DELIVERED TO TRANSFER SWITCH TERMINALS CONTACT WITH LIVE TERMINALS RESULTS IN EXTREMELY DANGEROUS AND POSSIBLY FATAL ELECTRICAL SHOCK 7 With an accurate AC voltmeter and frequency meter chec...

Page 10: ...ual Operation Handle and operating lever of transfer switch should be in UP position 10 Turn on the UTILITY power supply to transfer switch using the UTILITY SERVICE DISCONNECT circuit breaker The uti...

Page 11: ...9 Notes...

Page 12: ...10 Notes...

Page 13: ...11 Notes...

Page 14: ...12 Installation Diagram 200 Amp Enclosure Drawing 0G8775 B...

Page 15: ...8 9 B 2 1 3 9 8 7 B D1 A 6 3 4 5 2 1 7 6 3 2 1 4 5 1 2 2 1 3 1 2 3 4 5 6 J4 RL2 D2 1 2 2 1 3 TO LOADS NON ESSENTIAL TOP TERMINALS TO GROUNDING ELECTRODE 194 OPTIONAL ALARM CONTACT CUSTOMER SUPPLIED N...

Page 16: ...Part No 0H8807 Revision E 08 01 13 Printed in U S A...

Reviews: