Generac Power Systems RTSJ200A3 Owner'S Manual Download Page 15

  

13

0C4449A-T

BREAKER

TO SUPPLY

GFCI OUTLET

(IF FITTED)

GROUNDING ELECTRODE

CONNECTION

(LOCATED ON THE

REAR OF UNIT)

3

15

13

11

9

7

5

1

4

16

14

12

10

8

6

2

UTILITY

METER

SOCKET

A BONDING JUMPER IS PROVIDED

BETWEEN THE NEUTRAL LUG

AND ENCLOSURE AT THIS LOCATION

(FACTORY INSTALLED)

J6

J5

S1

F3

RL1

J3

J1

LOAD SHED
CONTROLLER

1

4

7

A

D2

5

6

8

9

B

21

3

98

7

B

D1

A

6

3

4

5

2

1

7

6

3

2

1

4

5

1

2

2

1

3

1

23

45

6

J4

RL2

D2

1

2

2

1

3

TO

LOADS

NON-ESSENTIAL

TOP TERMINALS

TO

GROUNDING 

ELECTRODE

194

OPTIONAL

(ALARM CONTACT)

CUSTOMER

 SUPPLIED

NEUT

N1

N2

T1

209

210

0

WHT

GRN

GENERATOR OUTPUT

CIRCUIT BREAKER

2 POLE

E2

23

GND

E1

NOTE: INSTALLATION TO BE DONE BY A 

LICENSED ELECTRICIAN AND MUST MEET ALL NATIONAL, STATE AND LOCAL ELECTRICAL CODES.

J6

J5

S1

RL2

0

23

194

N2

T1

GROUND

N1

N2

N1

E1

E2

0D9618-TO

0D9618-TO

Interconnection Drawing 0J0888-D

 Interconnection 

Diagram

Summary of Contents for RTSJ200A3

Page 1: ...This manual should remain with the unit Owner s Manual LTS Load Shed Switch...

Page 2: ...infor mation on tags decals and labels that may be affixed to the transfer switch Replace any decal or label that is no longer legible DANGER Connection of a generator to an electrical system normall...

Page 3: ...hazardous and possibly LETHAL electric shock DO NOT WORK ON THE TRANSFER SWITCH UNTIL ALL POWER VOLTAGE SUPPLIES TO THE SWITCH HAVE BEEN POSITIVELY TURNED OFF Competent qualified personnel should inst...

Page 4: ...will operate and disconnect the non essential loads which results in a reduction in the load on the generator The third function is a 16 circuit load center to connect the criti cal loads to These lo...

Page 5: ...switches 1 4 For one shot operation mode set DIP switch 5 to ON Reconnection of the non essential loads will occur one time after the time set on DIP switches 1 4 If DIP switch 5 is OFF the LSC will a...

Page 6: ...stalling Do not drop the switch Protect the switch against impact at all times and against construction grit and metal chips Never install a transfer switch that has been damaged This transfer switch...

Page 7: ...rals are to be connected on the busbars mounted on the load center next to the branch circuit breakers 2 6 CONNECTING CONTROL WIRES Control system interconnections consist of N1 N2 and T1 and leads 0...

Page 8: ...L position no further action is required If the handle is DOWN proceed with Step 1 Step 1 With the handle inserted into the moveable contact carrier arm move handle UP Be sure to hold on to the handle...

Page 9: ...NOW BEING DELIVERED TO TRANSFER SWITCH TERMINALS CONTACT WITH LIVE TERMINALS RESULTS IN EXTREMELY DANGEROUS AND POSSIBLY FATAL ELECTRICAL SHOCK 7 With an accurate AC voltmeter and frequency meter chec...

Page 10: ...ual Operation Handle and operating lever of transfer switch should be in UP position 10 Turn on the UTILITY power supply to transfer switch using the UTILITY SERVICE DISCONNECT circuit breaker The uti...

Page 11: ...9 Notes...

Page 12: ...10 Notes...

Page 13: ...11 Notes...

Page 14: ...12 Installation Diagram 200 Amp Enclosure Drawing 0G8775 B...

Page 15: ...8 9 B 2 1 3 9 8 7 B D1 A 6 3 4 5 2 1 7 6 3 2 1 4 5 1 2 2 1 3 1 2 3 4 5 6 J4 RL2 D2 1 2 2 1 3 TO LOADS NON ESSENTIAL TOP TERMINALS TO GROUNDING ELECTRODE 194 OPTIONAL ALARM CONTACT CUSTOMER SUPPLIED N...

Page 16: ...Part No 0H8807 Revision E 08 01 13 Printed in U S A...

Reviews: