 8 

3.4  

GENERATOR TESTS UNDER 
LOAD

3.4.1   ATS & CRITICAL LOADS

1.  Set the generator's main circuit breaker to its OFF or OPEN 

position.

2.  Set the UTILITY SERVICE DISCONNECT circuit breaker to the 

OFF position.

3.  Manually actuate the transfer switch main contacts to 

their GENERATOR (STANDBY) position. Refer to "Manual 

Operation".

4.  Manually actuate the LSS main contacts to the UP position. 

Non-essential loads OFF.

5.  To start the generator, set the AUTO/OFF/ MANUAL switch to 

MANUAL. When engine starts, let it stabilize for a few min-

utes.

6.  Turn the generator's main circuit breaker to its ON or CLOSED 

position. The generator now powers all LOAD circuits. Check 

generator operation under load as follows:

• Turn ON electrical loads to the full rated wattage/amperage 

capacity of the generator. DO NOT OVERLOAD.

• With maximum rated load applied, check voltage and fre-

quency across transfer switch terminals E1 and E2. Voltage 

should be greater than 230VAC and frequency should be 

greater than 59 Hertz.

•  Let the generator run under rated load for at least 30 minutes. 

With unit running, listen for unusual noises, vibration, over-

heating, etc., that might indicate a problem.

7.  When checkout under load is complete, set main circuit 

breaker of the generator to its OFF or OPEN position.

8.  Let the generator run at no-load for several minutes. Then, 

shut down by setting the AUTO/OFF/MANUAL switch to its 

OFF position.

9.  Move the switch's main contacts back to their UTILITY posi-

tion. For example, LOAD connected to UTILITY power supply. 

Refer to "Manual Operation". Handle and operating lever of 

transfer switch should be in UP position.

10.  Turn on the UTILITY power supply to transfer switch, using 

the UTILITY SERVICE DISCONNECT circuit breaker. The utility 

power source now powers the loads.

11.  Set the generator's AUTO/OFF/MANUAL switch to its AUTO 

position.

3.4.2    AUTO OPERATION AND LOAD SHED FUNCTIONAL 

TEST

1.  Set the generator’s main circuit breaker to its ON or CLOSED 

position.

2.  Set the UTILITY SERVICE DISCONNECT circuit breaker to the 

ON position.

3.  Set the generator’s AUTO/OFF/MANUAL switch to its AUTO 

position.

NOTE:

The Utility source will now be supplying the customer loads.

4.  Set the UTILITY SERVICE DISCONNECT circuit breaker to the 

OFF position. The generator will start and the transfer switch 

will connect the customer load to the Generator supply.

5.  Load shed function test. Press the LOAD SHED RESET/ TEST 

pushbutton on the outside of the ATS enclosure door. It will 

be necessary to press this button for 

6 seconds. Release 

the pushbutton when the Load Shed Switch (LSS) actuates, 

disconnecting the non-essential loads. The LOAD SHED LED 

will illuminate. 

6.  The next step will depend on how the LSC is set up (see the 

“Load Shed Controller” section). If set up for:

• Manual Operation - Press the door mounted LOAD SHED 

RESET/ TEST pushbutton for 

2 seconds. Release the 

pushbutton when the LSS actuates, reconnecting the non-

essential loads.

• Automatic Operation – The LSS will reconnect non-essential 

loads after the delay setup on the DIP switches of the LSC.

7.  Set  the UTILITY SERVICE DISCONNECT circuit breaker to the 

ON position. The ATS will transfer the customer load to the 

Utility supply. The Generator will turn OFF after the cooldown 

period has expired.

Operation

Summary of Contents for RTSJ200A3

Page 1: ...This manual should remain with the unit Owner s Manual LTS Load Shed Switch...

Page 2: ...infor mation on tags decals and labels that may be affixed to the transfer switch Replace any decal or label that is no longer legible DANGER Connection of a generator to an electrical system normall...

Page 3: ...hazardous and possibly LETHAL electric shock DO NOT WORK ON THE TRANSFER SWITCH UNTIL ALL POWER VOLTAGE SUPPLIES TO THE SWITCH HAVE BEEN POSITIVELY TURNED OFF Competent qualified personnel should inst...

Page 4: ...will operate and disconnect the non essential loads which results in a reduction in the load on the generator The third function is a 16 circuit load center to connect the criti cal loads to These lo...

Page 5: ...switches 1 4 For one shot operation mode set DIP switch 5 to ON Reconnection of the non essential loads will occur one time after the time set on DIP switches 1 4 If DIP switch 5 is OFF the LSC will a...

Page 6: ...stalling Do not drop the switch Protect the switch against impact at all times and against construction grit and metal chips Never install a transfer switch that has been damaged This transfer switch...

Page 7: ...rals are to be connected on the busbars mounted on the load center next to the branch circuit breakers 2 6 CONNECTING CONTROL WIRES Control system interconnections consist of N1 N2 and T1 and leads 0...

Page 8: ...L position no further action is required If the handle is DOWN proceed with Step 1 Step 1 With the handle inserted into the moveable contact carrier arm move handle UP Be sure to hold on to the handle...

Page 9: ...NOW BEING DELIVERED TO TRANSFER SWITCH TERMINALS CONTACT WITH LIVE TERMINALS RESULTS IN EXTREMELY DANGEROUS AND POSSIBLY FATAL ELECTRICAL SHOCK 7 With an accurate AC voltmeter and frequency meter chec...

Page 10: ...ual Operation Handle and operating lever of transfer switch should be in UP position 10 Turn on the UTILITY power supply to transfer switch using the UTILITY SERVICE DISCONNECT circuit breaker The uti...

Page 11: ...9 Notes...

Page 12: ...10 Notes...

Page 13: ...11 Notes...

Page 14: ...12 Installation Diagram 200 Amp Enclosure Drawing 0G8775 B...

Page 15: ...8 9 B 2 1 3 9 8 7 B D1 A 6 3 4 5 2 1 7 6 3 2 1 4 5 1 2 2 1 3 1 2 3 4 5 6 J4 RL2 D2 1 2 2 1 3 TO LOADS NON ESSENTIAL TOP TERMINALS TO GROUNDING ELECTRODE 194 OPTIONAL ALARM CONTACT CUSTOMER SUPPLIED N...

Page 16: ...Part No 0H8807 Revision E 08 01 13 Printed in U S A...

Reviews: