Installation Guidelines for Air-Cooled Generators
7
Section 2
Unpacking and Inspection
2.1 — General
NOTE: After unpacking, carefully inspect the contents for damage. Thoroughly inspect the unit immediately
upon delivery to determine if any damage occurred in transit. Any claims for shipping damage need to be filed
with the freight carrier as soon as possible. This is especially important if the generator is not be installed for
a period of time. Any shipping damage, whether obvious or not readily apparent, is not covered by the war-
ranty.
•
The standby generator set is ready for installation with a factory supplied and pre-mounted base pad and has a
weather protective enclosure that is
intended for outdoor installation only
.
•
If any loss or damage is noted at time of delivery, have the person making the delivery note all damage on the
freight bill or affix their signature under the consignor’s memo of loss or damage.
•
If a loss or damage is noted after delivery, separate the damaged materials and contact the carrier for claim pro-
cedures.
•
“Concealed damage” is understood to mean damage to the contents of a package that is not evident at the time
of delivery, but is discovered later.
2.2 — Required Tools
•
General SAE and Metric hand tools
– Wrenches
– Sockets
– Screwdrivers
•
Standard electrician’s hand tools
– Drill and bits for mounting and routing conduits
•
4mm Allen wrench (for access to customer connections)
•
3/16 Allen wrench (test port on fuel regulator)
•
Manometer (for fuel pressure checks)
•
Meter capable of measuring AC Voltage and Frequency
•
Meter capable of measuring AC Current