Lattner Boiler Company
Instruction Manual – WLF Models
February 2005
48
Easy Topog-E
®
Boiler Installation Instructions
1.
Remove old gasket and thoroughly clean the surface on boiler and on cover plate.
Sometimes it is necessary to buff each surface.
2.
Place Topog-E® Gasket on handhole cover plate.
Be sure the gasket is pushed down
tight on the plate. Do not use any grease, lubricant, or adhesive.
3.
After cover plate is in boiler and gasket is in place, make one last cleaning swipe of the
mating surface in the boiler. Use a rag wrapped around your finger.
4.
Set crab, then center plate in opening and tighten nut enough to give a snug fit. Then,
snug up with 1/4 turn of wrench.
SPECIAL NOTES:
•
If gasket leaks while pressure is being built up, tighten only enough to stop leakage.
Never over-compress a gasket.
•
Gaskets on the bottom of a boiler shell are usually hard to install without leaking
because particles of scale or sand tend to run down onto the mating surface between
the time the surface is cleaned and the handhole cover plate is put into place ready
Page 30
Summary of Contents for Lattner
Page 1: ...Instruction Manual WLF Steam Boilers 2006 to 2007 ...
Page 32: ...Page 32 ...
Page 33: ...Page 33 ...
Page 34: ...Page 34 ...
Page 35: ...Page 35 ...
Page 36: ...Page 36 ...
Page 37: ...Page 37 ...
Page 38: ...Page 38 ...
Page 39: ...Page 39 ...
Page 40: ...Page 40 ...
Page 41: ...Page 41 ...
Page 42: ...Page 42 ...
Page 43: ...Page 43 ...
Page 44: ...Page 44 ...
Page 45: ...Page 45 ...