Warrick Relay Replacement
1.
Disconnect all power to the boiler.
2.
Pull relay out by hand. This may take a little
force but be careful.
3.
Replace the Warrick with a new 26M series
Warrick. The relay has a small tab so that it
can be installed only one way.
4.
Reconnect the power to the boiler.
J. Auxiliary Low Water Cut-Off Probe Cleaning
1.
Disconnect all power to the boiler.
2.
Remove the four screws on top of the probe
enclosure with a Phillips screwdriver.
3.
Remove the wire from the probe using a 5/16"
wrench or a crescent wrench. Only the wire on the
probe is to be removed.
4.
Use a 13/16" spark plug socket and remove the
probe.
5.
Clean the stainless steel probe and probe fitting.
6.
Reinsert the probe using a 13/16" spark plug
socket. Only tighten the probe enough to stop any
steam leaks. Over tightening will destroy the
threads of the enclosure.
7.
Reinstall the probe wire to the probe.
8.
Reassemble the cover to the enclosure with the
four Phillips screws.
9.
Reconnect power to the boiler.
Summary of Contents for Lattner
Page 1: ...Instruction Manual WLF Steam Boilers 2006 to 2007 ...
Page 32: ...Page 32 ...
Page 33: ...Page 33 ...
Page 34: ...Page 34 ...
Page 35: ...Page 35 ...
Page 36: ...Page 36 ...
Page 37: ...Page 37 ...
Page 38: ...Page 38 ...
Page 39: ...Page 39 ...
Page 40: ...Page 40 ...
Page 41: ...Page 41 ...
Page 42: ...Page 42 ...
Page 43: ...Page 43 ...
Page 44: ...Page 44 ...
Page 45: ...Page 45 ...