Rev. 00 01/22
PH300
Assembly / Connection
•
15
Assembly / Connection
Set-up
The fresh powder hopper is used in combination with powder coating
plants.
Installation work to be done by the customer must be carried out
according to local safety regulations!
NOTICE
Surrounding temperature too high
– Install the product only in locations with an ambient temperature
of b10 °C and +40 °C, i.e. never next to heat sources
(such as an enameling furnace) or electromagnetic sources (such
as a control cabinet).
–
All hose connections should be as short as possible.
–
The venting hose should be laid out without loops so that depositing,
and clogging are prevented.
–
Check the hose connections for a good seal, and firm seating
–
Check the interlocking, so that the fresh powder hopper only works
when the exhaust system is switched on.
Connecting the powder hopper
The powder hoppers delivered by the manufacturer are ready for
operation. Just a few hoses must be connected additionally.
Connecting the supply
Connecting the electrics
Only locally authorized specialists may install and inspect the electrical
elements of the machine.
In the event of customizations, the wiring diagram may differ.
Summary of Contents for PH300
Page 20: ...Rev 00 01 22 20 Start up PH300 ...
Page 22: ...Rev 00 01 22 22 Operation PH300 ...
Page 28: ...Rev 00 01 22 28 Maintenance Repairs PH300 ...
Page 32: ...Rev 00 01 22 32 Disposal PH300 ...
Page 38: ...Rev 00 ...