
5.
Attach to Adjoining Worksurface
A.
Locate position of runoff desk relative to adjoining worksurface.
B.
Locate flat brackets (10188) so that they are towards the edges of the runoff desk, but not exposed.
C.
Attach flat brackets to adjoining worksurface using #8 x 1" flat head wood screws (50162).
D.
Position runoff desk over flat brackets and attach to flat brackets using #8 x 1" flat head wood screws(50162).
E.
Level runoff desk.
Page 10
Geiger Levels
Right
ON SITE
Installation Principles
ROS-LVRD
Geiger Levels Runoff Desks
1B6SZ5