
3.
Attach Clips to Wall
A.
Using perforations in the wall as a guide, fasten upper clips and lower wall clips to wall using #8 x 1" flat
head screws.
4.
Attach Tackboard to Clips
A.
Slide tackboard upwards into upper clips using perforations on top edge of tackboard as a guide.
(Note: If there is a task light cord, it must be fed behind tackboard, make sure cord sits in groove
near the end of the tackboard).
(Note: For Upper Storage unit application, make sure tackboards are set tight to inside of hutch end panels).
B.
Snap lower panel clips onto lower wall clips.
Upper Clips (1B4Y4H)
Lower Wall Clips (1B4Y4G)
Task light cord grooves
Geiger Levels
Right
ON SITE
Installation Principles
ROS-LVTB
Geiger Levels Tackboard
1B5VJF