page | 64
Up to now, we have created a simple project that will loop continuously. However, the
Signage Manager Express
software also allows you to define a schedule which will play
the content every week. The included weekly schedule templates can be modified or you
can create your own weekly schedule from scratch. Let’s look at an example.
1. Select File > New(N) to clear the current project.
2. Select
Weekly schedule
mode from the
Edit
menu or select it from the drop-down list
at the top of the screen.
On the left side of the screen, there are four templates that can be modified for your
own use:
Bakery
,
Fast Food
,
Food Court
, and
Shopping Mall
.
3. Drag-and-drop the
Bakery
template to the scheduling area, as shown below:
Signage Manager Express Software
Using Weekly Schedules