![GE TYPHOON FLA 7000 Getting Started Download Page 78](http://html1.mh-extra.com/html/ge/typhoon-fla-7000/typhoon-fla-7000_getting-started_4110878078.webp)
Placing a titer plate on the Multi
stage
Aðgerð
Þrep
Place the titer plate frame on the Multi stage.
1
Place the titer plate in the desired position in the titer plate frame.
2
Placing a gel sample with glass
on the Multi stage
Aðgerð
Þrep
Place a gel sample with glass on the Multi stage.
1
78
Getting Started with Typhoon FLA 7000 28-9607-64 AD
5 Reading fluorescent samples
5.2 Place the sample on the stage