Chapter 2. Installation
TransPort
®
PT900 User’s Manual
31
2.5.6c Even-Traverse Installations (Spacing>305 mm/12 in.)
(cont.)
6.
Place the fixed clamp in the clamping fixture at zero on the scale. As an
example, if the required transducer spacing is 435 mm/17.13 in., measure
the required 435 mm/17.13 in. distance from the edge of the fixed clamp
to the marked line on the yoke (see
below).
Figure 39: Yoke Set at 435 mm/17.13 in.
7.
Tighten the nuts to secure the yoke to the pipe (see
below).
Figure 40: Secure the Yoke
Fixed Clamp
Yoke
435 mm/17.13 in.
at Zero
Marking
Line
Summary of Contents for TransPort PT900
Page 2: ......
Page 4: ...ii TransPort PT900 User s Manual no content intended for this page ...
Page 18: ...Chapter 1 Introduction 2 TransPort PT900 User s Manual no content intended for this page ...
Page 60: ...Chapter 2 Installation 44 TransPort PT900 User s Manual no content intended for this page ...
Page 106: ...Chapter 4 Programming 90 TransPort PT900 User s Manual no content intended for this page ...
Page 124: ...Chapter 6 Logging Data 108 TransPort PT900 User s Manual no content intended for this page ...
Page 172: ...Appendix A Specifications 156 TransPort PT900 User s Manual no content intended for this page ...
Page 189: ......