
Chapter 2. Installation
TransPort
®
PT900 User’s Manual
11
2.5.3 Mounting the Clamp-On Fixture (cont.)
3.
Adjust the clamp-on fixture position so that the outer edge of the closest
end piece is located at the chosen distance from the nearest inlet, outlet,
joint or fitting in the pipeline (see
below).
Figure 10: Adjusting the Fixture Position
4.
Place the clamp-on fixture on top of the pipe so that minimal effort is
required to maintain its position during installation (see
below).
Figure 11: Fixture Placed on Top of Pipe
>6”/150 mm
Summary of Contents for TransPort PT900
Page 2: ......
Page 4: ...ii TransPort PT900 User s Manual no content intended for this page ...
Page 18: ...Chapter 1 Introduction 2 TransPort PT900 User s Manual no content intended for this page ...
Page 60: ...Chapter 2 Installation 44 TransPort PT900 User s Manual no content intended for this page ...
Page 106: ...Chapter 4 Programming 90 TransPort PT900 User s Manual no content intended for this page ...
Page 124: ...Chapter 6 Logging Data 108 TransPort PT900 User s Manual no content intended for this page ...
Page 172: ...Appendix A Specifications 156 TransPort PT900 User s Manual no content intended for this page ...
Page 189: ......