
Chapter 2. Installation
12
TransPort
®
PT900 User’s Manual
2.5.3 Mounting the Clamp-On Fixture (cont.)
5.
Verify that the pipe rests in the small cutout slot on the bottom of the end
pieces (see
below). Also, be sure that the scale markings on the
rail rod of the clamp-on fixture can be easily read after the installation has
been completed.
Figure 12: Cutout Slot
6.
To install a chain around the pipe, refer to
and
complete the following steps:
a.
Identify the
chain screw mechanism
, the
end flat
and the
chain slot
on
the clamping fixture end piece closest to the reference pipe fitting.
b.
Unscrew the chain screw mechanism, then wrap the metal chain all
the way around the pipe.
c.
Push down on the top of the chain screw mechanism and hold it
down. Then, pull the chain so that it is snug around the pipe and slide
the chain into the small slot located at the opposite side of the end
piece from the chain screw mechanism.
d.
Release the chain screw mechanism and tighten it just enough to
remove any slack in the chain.
Slot
Summary of Contents for TransPort PT900
Page 2: ......
Page 4: ...ii TransPort PT900 User s Manual no content intended for this page ...
Page 18: ...Chapter 1 Introduction 2 TransPort PT900 User s Manual no content intended for this page ...
Page 60: ...Chapter 2 Installation 44 TransPort PT900 User s Manual no content intended for this page ...
Page 106: ...Chapter 4 Programming 90 TransPort PT900 User s Manual no content intended for this page ...
Page 124: ...Chapter 6 Logging Data 108 TransPort PT900 User s Manual no content intended for this page ...
Page 172: ...Appendix A Specifications 156 TransPort PT900 User s Manual no content intended for this page ...
Page 189: ......