10
2097937-002 Rev G
T2100-ST1 Treadmill, 110V / T2100-ST2 Treadmill, 220V
181
11 March 2019
10
Functional / Post Repair / Preventative
Maintenance Checkout Procedures
This chapter identifies the tools and checkout procedures that
need to be performed to ensure the T2100-ST Series treadmills
and individual components are functioning properly and safe to
use. These procedures are performed after completing any
repair, exchange, or preventative maintenance procedure.
Tools Required
All or some of the following tools may be required to perform the
various checkout procedures. For a list of which tools are
required for each procedure, refer to “Procedural Lists” on page
185.
1.
Applicable service and/or operator manual, as needed.
2.
Standard hand tools.
3.
Anti-static wrist strap.
4.
Leakage tester.
5.
Multimeter.
6.
T2100-ST Series Calibration software.
Checkout Procedures
The following topics detail the individual checkout procedures.
For a list of which procedures to perform after completing each
repair or preventative maintenance procedure, refer to
“Procedural Lists” on page 185.