3.6 UNPACKING
The UPS and
Battery Cabinets
may be shipped packaged in carton boxes or in wooden crates (if
requested).
Move the cabinets as close as possible to the final location before removing from the pallet.
If delivered in a wooden crate, remove the cabinet from the pallet with care, because of the heavy
weight of the equipment.
White color
=
without any anomaly
Red color
=
anomaly evidence
Fig. 3.6-1 ShockWatch device
The package of the
SG Series 225 & 300
is
equipped with
ShockWatch
(indicator for shock),
and
TiltWatch
(indicator for overthrow) on the
outside.
These devices indicate an eventual shock or
overthrow during transport.
Whenever these devices show a possible
anomaly, the UPS shall not be commissioned
before consulting a
“Service Center”
.
Fig. 3.6-2 TiltWatch device
NOTE !
Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to
Utility
or
Battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.
For parallel systems, the delivery also includes the bus control cables for inter-
connecting the UPS modules.
Packing material recycling
GE
, in compliance with environment protection, use only environmentally friendly
material.
UPS packing materials must be recycled in compliance with all applicable
regulations.
Modifications reserved
Page 16/40
OPM_SGS_ISG_M22_M30_2US_V010.doc
Installation Guide
SG Series 225 & 300 UL S2