Modifications reserved
Page 50/79
OPM_SGS_USM_M22_M30_2US_V010.doc
User Manual
SG Series 225 & 300 UL S2
3. Open the UPS Output Switch Q1 (Pos. O) and then press the “Load Off” button
.
•
The
load
is now supplied only through the
Manual Bypass Q2.
•
Rectifier
shuts down and all output and input
Contactors
are opened.
•
Press the
“MUTE”
key to reset the
alarm buzzer
.
The
Synoptic Diagram
must display the status
“
LOAD
SUPPLIED BY MANUAL BYPASS Q2
”.
4. Disconnect the Battery from the UPS by opening (Pos. O) the External Battery Switch or Fuses.
•
Wait
5 minutes
for DC-Link Capacitors discharge.
The
Load
is now powered from the
Utility
through
Manual Bypass Q2 (option)
.
END OF PROCEDURE
WARNING!
It will take a minimum of 5 minutes for the DC capacitors to discharge.
Open only the front door, do not open any other part of the UPS.