—
54
—
Operation procedures/pictures
Disassembling right sideboard
Unscrew the 7 screws that fix the right
sideboard to take out the right sideboard as
shown in Fig.8-39.
Disassembling reactor box
and electric box assembly
Screw off the 2 screws that fix the electric box
cover to remove the cover of electric box.
Screw off 2 screws fixing the reactor box
assembly and remove the frame for
temperature sensor to remove the reactor box.
Screw off 4 screws fixing the reactor to remove
the reactor box.
Screw off 2 screws fixing the electric box and
unloose each wire bundle and unplug the
connection wire to take off the electric box as
shown in Fig.8-40, 8-41, 8-42.
Screw
Fig. 8-39
Screw Electric box cover
Fig.8-40
Sensor support
Reactor box
Reactor
Screw
Fig.8-41
Summary of Contents for PRO AIR 107
Page 2: ... 1 Summary and features Model Remark PRO AIR 107 IN PRO AIR 107 OUT 1Ph 230V 50Hz R410A 1 ...
Page 4: ... 3 Model Remark PRO AIR 218 IN PRO AIR 218 OUT 1Ph 230V 50Hz R410A ...
Page 5: ... 4 Model Remark GE AIR 326 IN1 GE AIR 326 IN2 GE AIR 326 OUT 1Ph 230V 50Hz R407C ...
Page 6: ... 5 Model Remark GE AIR 428 IN GE AIR 428 OUT 1Ph 230V 50Hz R407C ...
Page 20: ... 19 4 2 Outline and installation dimensions of indoor unit 20 Handle 60cm Bolt Nut Spanner ...
Page 71: ... 70 Explosive view and parts list Explosive view of parts and components of indoor unit 9 ...
Page 75: ... 74 Explosive view of parts and components of outdoor unit ...
Page 77: ... 76 Explosive view of parts and components of outdoor unit frequency converter ...
Page 79: ... 78 Explosive view of parts of outdoor unit one driving two ...
Page 81: ... 80 Explosive view of parts of outdoor unit one driving three ...
Page 83: ... 82 Explosive view of parts of outdoor unit one driving four ...
Page 101: ... 100 ...