
2. Setting Up for Phased Array Measurement
Page 32
PHASOR XS Operating Manual
Calibration Procedure
Step 1:
Access the CAL submenu located in the PART
menu.
Step 2:
Adjust the VELOCITY setting until the displayed
SBA measures 3 inches (or 75 mm if an EN block is
used)
Step 3:
Adjust the PROBE DELAY setting until the dis-
played SA measures 1 inch (or 25 mm if an EN block is
used)
Step 4:
Recalculate the delay laws by pressing
three
times.
A
B
Summary of Contents for Phasor CV
Page 6: ...Contents Page 4 PHASOR XS Operating Manual...
Page 16: ...1 Phased Array Operation Keypad Menus and Displays Page 14 PHASOR XS Operating Manual...
Page 24: ...2 Setting Up for Phased Array Measurement Page 22 PHASOR XS Operating Manual...
Page 86: ...5 Making Conventional Measurements Page 84 PHASOR XS Operating Manual...
Page 92: ...6 Storing Data Sets and Generating Reports Page 90 PHASOR XS Operating Manual...
Page 96: ...7 Technical Speci cations Page 94 PHASOR XS Operating Manual...