![GE Monogram ZWVS1000SR Installation Instructions Manual Download Page 12](http://html1.mh-extra.com/html/ge/monogram-zwvs1000sr/monogram-zwvs1000sr_installation-instructions-manual_4114733012.webp)
Step 6:
Set the 34-1/2” panel into base
channel. Then install the opposite
rear corner panel. Use the hex key
to securely lock the panels together.
INSTALLATION INSTRUCTIONS
12
ASSEMBLE WALL AND CEILING PANELS
23” wide
panel
46” wide
panel
34
1
⁄
2
”
wide
panel
Step 7:
Set the other 23” wide panel into
the channel into the channel. Lock
the side panel to the corner panel.
Place the rear (35”) ceiling panel
over the top of the walls. Align the
ceiling panel with the rear and side
walls. The ceiling panel will help to
stabilize the structure during the
rest of the assembly. DO NOT LOCK
THE CEILING PANEL LATCHES AT
THIS TIME.
23” wide
panel