
June 2003
2-16
Troubleshooting and Maintenance
Adding or Removing a
PCMCIA Card
To expand the memory or replace software, the Series 1 controller
board has brackets for a linear SRAM PCMCIA expansion card that
can hold up to 1 Mbyte of data. To install or remove the card, proceed
as described below.
Caution!
The Series 1 is not compatible with a flash or ATA card.
Please contact GE Panametrics for a list of compatible
devices and formatting.
Procedure for Adding or
Removing a PCMCIA
Card
1.
Make sure you have a record of the following data, described in
the
Programming Manual
on the referenced pages
:
Note:
This information should have been recorded on the Program
Information List in Appendix A of the
Startup Guide
or on a
separate sheet of paper.
•
Probe configuration (page 2-9)
•
Probe calibration data (see the Calibration Data Sheets). See page
2-12.
•
Reference values (page 2-17)
•
Recorder Outputs (page 3-3)
•
Alarm Outputs (page 3-4)
•
Data Logger (page 3-18)
Caution!
Make sure you have a record of the data listed above
before you reinitialize the system.
2.
Turn the power off and unplug the unit.
3.
Discharge static from your body.
4.
Open the enclosure by removing the screws on the front panel and
sliding the electronics unit out.
Summary of Contents for Moisture Image 1 Series
Page 2: ...Moisture Image Series 1 Service Manual ...
Page 8: ...Chapter 1 ...
Page 31: ...Chapter 2 ...
Page 61: ...Appendix A ...