![GE MG-101 User Manual Download Page 21](http://html.mh-extra.com/html/ge/mg-101/mg-101_user-manual_128400021.webp)
MG-101 User’s Manual
13
Chapter 2. Setup and Operation
2.2.5 Preparation for Shipping
To ship or to move the MG-101, refer to
below and empty the saturator bottle as follows:
1.
Remove the rear panel by removing the two small screws at the bottom.
2.
Fully open the vent valve by turning it counter-clockwise.
3.
Place the end of the fill tubing in a container below the level of the saturator bottle and open the petcock.
4.
When the saturator bottle is completely empty, close the petcock and the vent valve, and reinstall the rear panel.
Figure 7: Emptying the Saturator Bottle
Saturator Bottle
Fill Tubing
Petcock
Screws (2)
Summary of Contents for MG-101
Page 1: ...GE Measurement Control Moisture 910 115 Rev E March 2012 MG 101 User s Manual ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 8: ...Contents vi MG 101 User s Manual no content intended for this page ...
Page 12: ...Chapter 1 General Information 4 MG 101 User s Manual no content intended for this page ...
Page 22: ...Chapter 2 Setup and Operation 14 MG 101 User s Manual no content intended for this page ...
Page 32: ...Warranty 24 MG 101 User s Manual no content intended for this page ...
Page 33: ......