6.
Open and adjust the valves on both the
DRY GAS FIRST DILUTION
and the
DRY GAS SECOND DILUTION
rotameters, so
that the
steel ball
indicates approximately
“10”
on the rotameter scales.
7.
Adjust the vent valve so that the
steel ball
on the
WET GAS DILUTED
rotameter also reads approximately
“10.”
IMPORTANT:
Leak test all connections from the nitrogen supply to the calibration chamber before proceeding.
8.
Allow the nitrogen to purge through the entire system at the rotameter settings defined in the previous steps. The
calibration system will begin to dry down and eventually come to equilibrium with the dry nitrogen supply gas.
The time required to achieve equilibrium will vary depending on the moisture level of the nitrogen (approximately
6 to 18 hours will be required).
9.
After the calibration system has reached equilibrium, set the valve on the
WET/DRY
rotameter to the
WET
position.
Figure 6: Rotameters and Valves
Temperature
Gauge
Vent Valve
Wet/Dry
Selector Valve
Dry Gas
Second Dilution
Wet Gas
Rotameters
Wet Gas
Dry Gas
First Dilution
Diluted
Summary of Contents for MG-101
Page 1: ...GE Measurement Control Moisture 910 115 Rev E March 2012 MG 101 User s Manual ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 8: ...Contents vi MG 101 User s Manual no content intended for this page ...
Page 12: ...Chapter 1 General Information 4 MG 101 User s Manual no content intended for this page ...
Page 22: ...Chapter 2 Setup and Operation 14 MG 101 User s Manual no content intended for this page ...
Page 32: ...Warranty 24 MG 101 User s Manual no content intended for this page ...
Page 33: ......