![GE MG-101 User Manual Download Page 14](http://html.mh-extra.com/html/ge/mg-101/mg-101_user-manual_128400014.webp)
Chapter 2. Setup and Operation
6
MG-101 User’s Manuall
2.1 Preliminary Setup (cont.)
3.
Open the petcock.
4.
Fully
open the vent valve on the front panel by turning it counter-clockwise, and turn the
WET/DRY SELECTOR
VALVE
to
WET
(see
below).
5.
Using the squeeze bottle, fill the saturator bottle until the water level reaches the fill mark on the bottle (see
6.
Close the petcock and reinstall the back panel.
Figure 3: MG-101 Front Panel
Vent Valve
Wet/Dry
Selection Valve
Inlet Fitting
Outlet Fitting
Summary of Contents for MG-101
Page 1: ...GE Measurement Control Moisture 910 115 Rev E March 2012 MG 101 User s Manual ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 8: ...Contents vi MG 101 User s Manual no content intended for this page ...
Page 12: ...Chapter 1 General Information 4 MG 101 User s Manual no content intended for this page ...
Page 22: ...Chapter 2 Setup and Operation 14 MG 101 User s Manual no content intended for this page ...
Page 32: ...Warranty 24 MG 101 User s Manual no content intended for this page ...
Page 33: ......