GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
4-52
Section 4-9 - Board Function Checks
4-9-10
Nest fan Function Validation Procedure
1.) After replace Nest fan assy, turn on the system. Refer to
3-5-1 "Power On/Boot Up" on page 3-11
2.) Confirm the fan rotating with naked eye and check the fan operating by rotating sound. No strange
sound should be heard.
NOTE:
Do not close the right EMI bracket and right plastic cover before check the fan operation.
4-9-11
Transbox Function Validation Procedure
1.) Turn on the system. Refer to
3-5-1 "Power On/Boot Up" on page 3-11
check Transbox Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to
Section 4-5 "Peripheral Checks" on page 4-26
to confirm
the peripheral operation. All peripheral must work correctly as described Section 4-5.
4-9-12
ACPC Assy set Function Validation Procedure
1.) Turn on the system. Refer to
3-5-1 "Power On/Boot Up" on page 3-11
check Transbox Assy function. The system must show correct operation as described on sequence.
2.) Check the peripheral operation. Refer to
Section 4-5 "Peripheral Checks" on page 4-26
to confirm
the peripheral operation. All peripheral must work correctly as described Section 4-5.
Figure 4-50 Checking Nest fan rotating