GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
Section 2-1 - Overview
2-1
Chapter 2
Pre-Installation
Section 2-1
Overview
2-1-1
Purpose of chapter 2
This chapter provides the information required to plan and prepare for the installation of a LOGIQ™ P5.
Included are descriptions of the facility and electrical needs to be met by the purchaser of the unit. A
checklist is also provided at the end of this section to help determine whether the proper planning and
preparation is accomplished before the actual equipment installation is scheduled.
Table 2-1
Contents in Chapter 2
Section
Description
Page Number