3 PIST0004 - Above Grade Base Plate Insert Installation
3.1 Personnel Requirements
Personnel
Requirements
Preliminary Reqs
Procedure
Finalization
1
0 min
1 hour
0 min
3.2 Overview
The base plate insert, is provided to separation of the electrical cables and the water hoses as
they pass through the building floor as required by NEC (National Electrical Code) or other local
code requirements. Installation of this insert requires coordination with the electrical contractor to
determine the length of the 6” threaded NPT (National Pipe Thread) conduit that will be required
to connect between the insert and the contractor supplied conduit.
3.3 Preliminary Requirements
3.3.1 Consumables
Item
Qty
Effectivity
Part#
Manufacturer
(Base Plate Assembly)
1
-
2285048
-
(grout + anchor bolts +
water / electric Separator)
1
-
2285052
-
(grout + through bolts +
water / electric Separator)
1
-
2285053
-
Elegance Add–on kit
1
-
2360538
-
3.4 Procedure
1. Verify floor cable opening is drilled to a size of 9” (225 mm).
2. Attach contractor supplied 6” conduits to the base plate insert. Refer to
or
.
3. Place insert into cable opening.
4. Connect vertical conduit to floor conduit (contractor supplied hardware).
Single Plane and Biplane Innova Systems Pre–Installation Kit Installation Procedures
GE Healthcare
Direction 2290880-12-1EN, Revision 1
28
3 PIST0004 - Above Grade Base Plate Insert Installation
Summary of Contents for Innova Series
Page 53: ......