
Chapter 1: Installation
Page 2
HygroPro User’s Manual
1.2 Sample System Guidelines
The
HygroPro
transmitter can be installed in a sample system or
directly in the process line. However, GE recommends that the unit be
installed in a sample system to protect the probe from potentially
damaging components in the process stream.
Figure 1
below shows a
typical sample system.
Figure 1: A Typical Sample System
Note:
At least 5 ft (1.5 m) of 1/4” (6 mm) tubing vented to
atmosphere will ensure an accurate process sample and avoid
diffusion of ambient air moisture back into the process.
Flo
w
Probe
Valve 1
Valve 2
Flow Cell
See note below
Intake near the center of the
pipe is recommended.
HygroPro
Needle
Needle
Summary of Contents for HygroPro
Page 1: ...GE Measurement Control Moisture 916 099 Rev D November 2012 HygroPro User s Manual ...
Page 2: ......
Page 4: ...ii no content intended for this page proceed to next page ...
Page 24: ...Chapter 1 Installation Page 18 HygroPro User s Manual ...
Page 40: ...Chapter 2 Operation Page 34 HygroPro User s Manual ...
Page 48: ...Chapter 3 Service Maintenance Page 42 HygroPro User s Manual ...
Page 58: ......
Page 59: ......