GE H
EALTHCARE
D
IRECTION
5394152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Chapter 8 -
Page 8-99
7.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-45-4
Mounting Procedure
Install the new parts in the reverse order of removal.
When install Transbox assy, the transbox chases should be inserted into the guide rails which are under
the frame classic.
Table 8-46 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394152, Rev 1+, Section 8-2-45. Equipment
passed all required tests and is ready for use. “
Transbox/ Fan Function Validation Procedure
Outlet Test - Wiring Arrangement - USA &
Isolated Patient Lead (Source) Leakage–Lead
Isolated Patient Lead (Source) Leakage–Lead
Figure 8-145 Insert the Transbox assy