GE H
EALTHCARE
D
IRECTION
5394152,
Revision 5
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Page 8-82
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-35
Rear Hook
8-2-35-1
Tools
•
Common Phillips screwdrivers
8-2-35-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-35-3
Removal procedure
1.) Unscrew 2 screws (1-2) and remove Rear hook.
2.) Unscrew 2 screws (1-2) and remove.
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-35-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-122 Screws on rear hook
Figure 8-123 Screws on the rear hook fix brkt
Table 8-36 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394152, Rev 1+, Section 8-2-35. Equipment
passed all required tests and is ready for use. “