FVP 110 Fieldbus Valve Positioner Manual
186
GE Energy
23
1023
NV_CYCLE_
T
0
—
Cycle of saving the settings of non-volatile
attribute parameters to the EEPROM. 0 is set
with the FVP110, and saving is not cyclically
done.
24
1024
FREE_
SPACE
0
—
Shows the free space memory for
configurations as a percent value. FVP110
shows zero which means the pre-configured
resource.
25
1025
FREE_TIME
0
—
Shows the free time that can be used for
computations by resources but not supported
by the FVP110.
26
1026
SHED_RCAS 640000
Communication time-out setting for
communications with the device from which the
remote cascade setpoint is sent.
27
1027
SHED_ROUT 640000
Communication time-out setting for
communications with the device from which the
remote output setting is sent; not used in the
FVP110, however.
28
1028
FAULT_
STATE
1
—
Indicates the fault-state.
29
1029
SET_FSTATE 1
Sets the fault-state.
30
1030
CLR_FSTATE 1
Clears the fault-state.
31
1031
MAX_NOTIFY 3
—
Maximum number of alerts retained in the
device (FVP110).
32
1032
LIM_NOTIFY
3
Maximum number of alerts to be held by the
device (YVP110); used by the user to restrict
the number of alert notifications to the host to
prevent overflow of alert receptions in the host.
33
1033
CONFIRM_
TIM
20000 (ms)
Defines the time to wait for confirmation for an
alert.
34
1034
WRITE_
LOCK
Unlocked
Prohibits write access from outside the device
to the settings.
35
1035
UPDATE_
EVT
—
—
Shows the contents of an update event upon
occurrence.
36
1036
BLOCK_ALM
—
—
Shows the contents of an alarm event upon
occurrence.
Table 60
Resource Block Parameters (Continued)
Relative
Index
Index
Parameter
Name
Default
(factory
setting)
Write
Description
Summary of Contents for FVP110
Page 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Page 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Page 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Page 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Page 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Page 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Page 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Page 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Page 239: ...223 LM Parameter List Link Master Functions ...
Page 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Page 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Page 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Page 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 289: ...273 H Customer Maintenance Parts List ...
Page 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Page 291: ......