FVP 110 Fieldbus Valve Positioner Manual
92
GE Energy
Definition of Combining Function Blocks
The input/output parameters for function blocks are combined. Practically, the setting is
written to the FVP110 link object. See “Block Setting” on page 96 for details.
For the FVP110, in order to minimize the delay in data transfer between Transducer block
and AO function block, transducer blocks are designed to execute in conjunction with the
execution of AO function block. Therefore, in order to activate Transducer block, it is
necessary that AO function block is always defined in the schedule.
Execute the combined blocks synchronously with other blocks on the communications
schedule. In this case, change the FVP110 schedule according to Table 14. FVP110
schedule is set as shown in Table 14; change it as necessary.
Maximum execution times are:
❑
95 ms for AO block
❑
40 ms for each DI block
❑
95 ms for an OS block
❑
120 ms fora PID block.
For scheduling of communications for combination with the next function block, the
execution is arranged to start after a lapse of longer than the times above mentioned. Two
FVP110 function blocks
cannot
execute at the same time (execution time is overlapped).
Table 14
Execution Schedule of the FVP110 Function Blocks
Index
Parameters
Setting (Enclosed is factory-setting)
269
(SM)
MACROCYCLE_
DURATION
Cycle (MACROCYCLE) period of control or
measurement. Unit is 1/32 ms. (32000 = 1 s)
276
(SM)
FB_START_ENTRY.1
AO block startup time. Elapsed time from the
start of MACROCYCLE specified in 1/32 ms.
(32000 = 1 s)
278
(SM)
FB_START_ENTRY.2
-
.
.
.
289
(SM)
FB_START_ENTRY.14
-
Summary of Contents for FVP110
Page 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Page 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Page 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Page 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Page 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Page 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Page 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Page 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Page 239: ...223 LM Parameter List Link Master Functions ...
Page 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Page 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Page 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Page 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 289: ...273 H Customer Maintenance Parts List ...
Page 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Page 291: ......