FVP 110 Fieldbus Valve Positioner Manual
160
GE Energy
In Cas mode
Where:
Δ
MV
n
= change in control output
Δ
PV
n
= change in measured (controlled) value
= PV
n
- PV
n-1
Δ
T = control period = period_of_execution in block header
K = proportional gain = GAIN (= 100/proportional band)
TI = integral time = RESET
TD = derivative time = RATE
The subscripts, n and n-1, represent the sampling time and thus PV
n
and PV
n-1
denote the
PV value sampled most recently and the PV value sampled at the preceding control
period respectively.
Table 47 shows the PID control parameters.
Control Output
The final control output value, OUT, is computed based on the change in control output
Δ
MVn, which is calculated at each control period in accordance with the aforementioned
algorithm. The PID block performs the velocity type output action for the control output by
determining the value of the new control output (OUT) by adding the change in control
output calculated in the current control period,
Δ
MV
n
, to the current read-back value of
the MV(OUT), MVRB (BKCAL_IN). This action can be expressed as:
OUT = BKCAL_IN -
Δ
MV
n'
Δ
MV
n'
=
Δ
MV
n
which is scaled by PV_SCALE and OUT_SCALE
Table 47
PID Control Parameters
Parameter
Description
Valid Range
GAIN
Proportional gain
0.05 to 20
RESET
Integral time
0.1 to 10,000 (seconds)
RATE
Derivative time
0 to infinity
Summary of Contents for FVP110
Page 14: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 22: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 48: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 50: ...FVP 110 Fieldbus Valve Positioner Manual 34 GE Energy Block Diagram Figure 14 Block Diagram ...
Page 74: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 88: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 97: ...81 Dimensions Standard Specifications Dimensions Figure 46 Single Acting Actuator Dimensions ...
Page 99: ...83 Dimensions Standard Specifications Figure 48 Terminal Configuration ...
Page 100: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 115: ...99 View Object Configuration Table 11 View Object for Transducer Block continued ...
Page 117: ...101 View Object Configuration Table 18 View Object for AO Function Block ...
Page 119: ...103 View Object Configuration Table 20 View Object for OS Function Block ...
Page 121: ...105 View Object Configuration Table 22 View Object for Resource Block ...
Page 124: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 130: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 138: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 156: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 168: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 238: ...FVP 110 Fieldbus Valve Positioner Manual 222 GE Energy Table 72 LM Parameter Part List ...
Page 239: ...223 LM Parameter List Link Master Functions ...
Page 246: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 262: ...FVP 110 Fieldbus Valve Positioner Manual 246 GE Energy Table 85 Download Error Codes ...
Page 265: ...249 Comments on System Network Software Download Table 88 DOMAIN_DESCRIPTOR ...
Page 266: ...FVP 110 Fieldbus Valve Positioner Manual 250 GE Energy Table 89 DOMAIN_HEADER ...
Page 288: ...FVP 110 Fieldbus Valve Positioner Manual This page intentionally left blank ...
Page 289: ...273 H Customer Maintenance Parts List ...
Page 290: ...FVP 110 Fieldbus Valve Positioner Manual 274 GE Energy ...
Page 291: ......