DuraStation™ EV Charger User Manual
23
GE Industrial Solutions
©2014 GE Company All Rights Reserved
4.2.6
GE WattStation Connect Options
GE DuraStation is largely setup and ready to go at the factory. However, there are a few
configurable items to consider when setting up your DuraStation.
Configuration options in the GE Connect tab
Figure – 4.15
•
Proxy Server Required
This setting should be checked for Ethernet or WiFi connections when the network
administrator requires a Proxy server to be used to gain access to the internet.
•
Standalone Operation without GE Connect
This option, if checked, is preferred for
permanent off-network
operation … that is,
operation of the station without having it connected to the GE WattStation Connect cloud
service. It will completely disable the application that communicates to the cloud service,
thereby eliminating all internal errors and potentially anomalous operation when the
station is operated off network.
•
Device Unique Name, Controller Serial Number
These settings are set at the factory and generally should not be changed unless
specifically advised by GE factory service. Typically Device Unique Name is the same as
the station serial number.
•
Proxy Server Port and IP Address
These settings may be required if your network administrator requires a Proxy server to
be used to gain access to the Internet. Proxy Server Required must also be checked.
•
Time Zone Offset
The offset (in minutes) from GMT. Default is -300 which is the offset for U.S. EST.