Start-up
© 2017 General Electric Company – All Rights Reserved.
ADTS 405 R/F Mk2 Instruction Manual-English | 17
5.
Measuring ground pressure message. The system opens the zero valves and
after approximately 7 seconds the valves close and the routine continues. The
display shows:
6.
Equalizing system pressures message. The system opens the output valves, Ps
and Pt port pressures will safely remain at the original measured values:
7.
Display shows Leak Measure mode and the number of parameters last
selected in configuration:
Note:
(1) The ADTS 405 Mk2 is a continuous, self-monitoring system. If the system
detects an error, the display shows an error message. Lists of errors are detailed in
Section 6.2, “Error Messages,” on page 57.
Note:
(2) The display at power-up can be changed, see Section 7.3.6, “SETUP, [MORE],
[DISPLAYS/OPTIONS], [DISPLAY TYPE],” on page 85.
INFORMATION
The ADTS 405 Mk2 system may now be used. But for full
specification, accuracy and stability, wait the warm-up period of
15 minutes. The display shows “WARMUP” in the lower right hand corner.
This message clears automatically after the time period.
Measuring Ground
Pressures
PLEASE WAIT
Equalising System
Pressures
(Valves May Pulse)
PLEASE WAIT
Alt 0 ft
Leak Measure
CAS 0.0 kts
Leak Measure WARMUP