6
31-11072-1
Installation Instructions
INSTALLING THE COOKTOP
1
VERTICAL CLEARANCE
Install an approved junction box where it will be
easily reached through the front of the cabinet where
the cooktop will be located. The cooktop conduit is
4 feet long.
IMPORTANT:
The junction box must be located
where it will allow considerable slack in the conduit
for serviceability.
3
ATTACH FOAM TAPE
Apply the foam tape around the outer edge of the
glass. Do not overlap the foam tape.
NOTE:
On ZEU30 and ZEU36 models, apply the
foam tape around the outer edge of the glass on the
sides and rear of the unit only.
4
MOUNTING PARTS
Remove the hold down brackets and screws from the
literature package.
Screw the hold down bracket to the side of the
cooktop unit. Repeat for opposite side of cooktop.
2
PROTECT SURFACE OF COOKTOP
Place a towel or tablecloth onto the countertop. Lay
the cooktop upside down onto the protected surface.
Install junction box so that it
can be reached through the
front of the cabinet.
16”
Min.
Bottom of Cooktop
Cloth under Cooktop
Bottom of Cooktop
Foam Tape
Cooktop
Glass
Mounting Screw
Hold Down
Bracket
Pre-Drilled Hole
Bottom of Cooktop
Cooktop Glass
Foam Tape