System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
15
1-3
Installation Steering Guide
Note:
Read the following paragraphs carefully before continuing with this Steering Guide.
•
Pre
−
installation:
Pre
−
installation work is required to prepare the room for installing the
equipment. Check that this work is complete, if not, complete
pre
−
installation work now.
•
Inspection Report:
Some of the Steering Guide steps are factory performed. Refer to
Inspection
Report
Dir. 2167647 TDR, 2172166 TDR or 2179651 TDR(supplied with the
system) to know exactly which steps have already been performed.
•
Steering Guide:
Some steps of the Steering Guide refer to other Service Manual chapters.
When each task is performed, return to the Steering Guide and proceed with
the next step.
•
Clamping:
Do not forget to clamp the system cables for EMC compliance. Refer
to Job Card IST 005.
•
Pinning:
To facilitate critical realignment on
−
site, several sub
−
assemblies are
pre
−
drilled and pinned or marked during factory integration. Refer to Job
Cards IST001, IST002, IST003 and IST 004 for installation procedures
The Undertable configuration comes with several system cables
pre
−
installed in the Table Rolling frame. The remaining system cables are
pre
−
installed in the Tubestand assy. Take care not to damage these cables.
Data Base Backup:
Performed by Manufacturing on Xamine Calibration Diskette.
Step
Description
Done
Supporting Documents
ÍÍ
ÍÍ
CHECK
ÍÍ
ÍÍ
A1
ÍÍ
ÍÍ
See section 1-2-3 of this manual.
A2
UNPACKING
Collect the Product Locator cards
in sequential order
Mark each box when task is done
START
Vertical Bucky Stand CE, PIM Dir 2150305
−
100 (SG100),
Dir 2150301
−
100 (SG60)
MPH50/65/80, PIM Dir 2133000
−
100
XT CE, PIM Dir 46
−
019618
RS 85 CE, PIM Dir 2172805
−
100
See PRE
−
INSTALLATION MANUALS
and LOCAL LAYOUT DATA Compax 40E CE, PIM
Dir. 2150306
−
100
Pre
−
installation Requirements
are met
Continues on next page
1 person
1 Hour
2 people
4 Hours
Localize Installation Flowchart
Refer to Installation Flowchart for typical
main task durations