10
49-7762
Installation Instructions
INST
ALLA
TION INSTRUCTIONS
5. PREPARE WINDOW FOR
INSTALLATION
A.
Measure the width of the window opening.
B.
Mark the center line on the inside windowsill.
4. PREPARE THE CASE
NOTE:
Attach curtains to the air conditioner before
placing the air conditioner in the window.
A.
Install top mounting rail (if not already installed)
with four type A screws.
B.
Slide left-hand curtain assembly into left end of
top and bottom mounting rail. Repeat for right
hand curtain assembly.
C.
Fasten curtain retainer strips to the sides of the
outer case with four type A screws on each side.
KROHV8VHW\SH%VFUHZVWRVHFXUHWKHVLGH
panels in place.
3/8” Self Tapping
Screws
3/8” Self Tapping
Screws
Top Channel
Side Curtains
B
A
A. Width of window opening
B. Center line