BEFORE YOU BEGIN
Read these instructions completely
and carefully.
•
IMPORTANT
—
Save these
instructions for local inspector’s use.
•
IMPORTANT
—
Observe all
governing codes and ordinances.
•
Note to Installer –
Be sure to leave these
instructions with the Consumer.
•
Note to Consumer –
Keep these
instructions for future reference.
•
Skill level –
Installation of this appliance
requires basic mechanical skills.
•
Completion time –
Approximately 1 hour
•
We recommend that two people install
this product.
•
Proper installation is the responsibility
of the installer.
•
Product failure due to improper installation
is not covered under the Warranty.
•
You MUST use all supplied parts and use
proper installation procedures as described
in these instructions when installing this
air conditioner.
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com
Installation
Air Conditioner
Instructions
Some models require a 115/120-volt a.c.,
60 Hz grounded outlet protected with a
15-amp time delay fuse or circuit breaker.
The 3-prong grounding plug minimizes the
possibility of electric shock hazard. If the wall
outlet you plan to use is only a 2-prong outlet,
it is your responsibility to have it replaced with
a properly grounded 3-prong wall outlet.
ELECTRICAL REQUIREMENTS
TOOLS YOU WILL NEED
Phillips head screwdriver
Ruler or tape measure
Pencil
Level
Scissors or knife
CAUTION:
Do not, under any circumstances, cut or
remove the third (ground) prong from the
power cord.
Do not change the plug on the power cord
of this air conditioner.
Aluminum house wiring may present special
problems—consult a qualified electrician.
Flat-blade screwdriver
7
Power cord includes a current interrupter
device. A test and reset button is provided on
the plug case. The device should be tested on a
periodic basis by first pressing the
TEST
button
and then the
RESET
button. If the
TEST
button
does not trip or if the
RESET
button will not stay
engaged, discontinue use of the air conditioner
and contact a qualified service technician.