P50 Agile P153
5 Configuration
P153/EN M/B
5-54
2.3.16.9.2
Edit Settings
(If I>1 Function selected for IEC curve)
GROUP 1
Password protected window for “GROUP 1’’ settings:
SYSTEM CONFIG, OVERCURRENT, NEG SEQUENCE O/C, BROKEN
CONDUCTOR, EARTH FAULT 1, EARTH FAULT 2, THERMAL
OVERLOAD, COLD LOAD PICKUP, UNDERCURRENT and CB FAIL.
Note: Group 1 Setting will be seen only when it is enabled and set as
Active Group in Configuration setting.
COLD LOAD PKP
Password protected window for Cold Load Pickup i.e. tcold Time Delay,
tclp Time Delay, I>1 Status, I>2 Status, I>3 Status, IN1>1 Status, IN1>2
Status, IN1>3 Status, IN2>1 Status, IN2>2 Status and IN2>3 Status.
tcold Time Delay
7200 S
Editable setting
By using the (
5
) or (
6
) key, tcold Time Delay can be set. The setting
range is from 0 to 14400s in steps of 1s.
tclp Time Delay
7200 S
Editable setting
By using the (
5
) or (
6
) key, tclp Time Delay can be set. The setting
range is from 0 to 14400 in steps of 1.
I>1 Status
Enabled
Editable setting
By using the (
5
) or (
6
) key, desired I>1 Status is Enabled.
I>1 Current Set
1.50 A
Editable setting
By using the (
5
) or (
6
) key, I>1 Current Set can be set. The setting
range is from 0.05 to 4.00 In in steps of 0.01 In.
I>1 TMS
1.1
Editable setting
By using the (
5
) or (
6
) key, I>1 TMS can be set. The setting range is
from 0.025 to 1.2 in steps of 0.005
Summary of Contents for Agile P153
Page 3: ...P50 Agile P153 1 Introduction P153 EN M B 1 1 INTRODUCTION CHAPTER 1 ...
Page 4: ...1 Introduction P50 Agile P153 1 2 P153 EN M B ...
Page 10: ...1 Introduction P50 Agile P153 1 8 P153 EN M B ...
Page 11: ...P50 Agile P153 2 Safety Information P153 EN M A 2 1 SAFETY INFORMATION CHAPTER 2 ...
Page 22: ...Chapter 2 Safety Information P50 Agile P153 2 12 P153 EN M A ...
Page 23: ...P50 Agile P153 3 Hardware Design P153 EN M B 3 1 HARDWARE DESIGN CHAPTER 3 ...
Page 24: ...3 Hardware Design P50 Agile P153 3 2 P153 EN M B ...
Page 32: ...3 Hardware Design P50 Agile P153 3 10 P153 EN M B ...
Page 33: ...P50 Agile P153 4 Front Panel P153 EN M B 4 1 FRONT PANEL CHAPTER 4 ...
Page 34: ...4 Front Panel P50 Agile P153 4 2 P153 EN M B ...
Page 39: ...P50 Agile P153 5 Configuration P153 EN M B 5 1 CONFIGURATION CHAPTER 5 ...
Page 40: ...P50 Agile P153 5 Configuration P153 EN M B 5 2 ...
Page 150: ...P50 Agile P153 5 Configuration P153 EN M B 5 112 ...
Page 151: ...P50 Agile P153 6 Protection Functions P153 EN M B 6 1 PROTECTION FUNCTIONS CHAPTER 6 ...
Page 152: ...6 Protection Functions P50 Agile P153 6 2 P153 EN M B ...
Page 168: ...7 Protection Parameter Settings P50 Agile P153 7 2 P153 EN M B ...
Page 189: ...P50 Agile P153 8 Monitoring Control P153 EN M B 8 1 MONITORING CONTROL CHAPTER 8 ...
Page 190: ...8 Monitoring Control P50 Agile P153 8 2 P153 EN M B ...
Page 207: ...P50 Agile P153 9 SCADA Communications P153 EN M B 9 1 SCADA COMMUNICATIONS CHAPTER 9 ...
Page 208: ...12 SCADA Communications P50 Agile P153 9 2 P153 EN M B ...
Page 220: ...12 SCADA Communications P50 Agile P153 9 14 P153 EN M B ...
Page 221: ...P50 Agile P153 10 Installation P153 EN M B 10 1 INSTALLATION CHAPTER 10 ...
Page 222: ...10 Installation P50 Agile P153 10 2 P153 EN M B ...
Page 234: ...13 Commissioning Instructions P50 Agile P153 13 2 P153 EN M B ...
Page 242: ...12 Maintenance and Troubleshooting P50 Agile P153 12 2 P153 EN M B ...
Page 250: ...12 Maintenance and Troubleshooting P50 Agile P153 12 10 P153 EN M B ...
Page 252: ...13 Technical Specifications P50 Agile P153 13 2 P153 EN M B ...
Page 263: ...P50 Agile P153 14 Wiring Diagrams P153 EN M B 14 1 WIRING DIAGRAMS CHAPTER 14 ...
Page 264: ...14 Wiring Diagrams P50 Agile P153 14 2 P153 EN M B ...
Page 267: ......