
P50 Agile P153
5 Configuration
P153/EN M/B
5-27
CB Fail
Disabled
Editable setting
By using the (
5
) or (
6
) key, CB Fail can be Enabled or Disabled.
Setting Values
Secondary
Editable setting
By using the (
5
) or (
6
) key, Setting Values can be set as Primary /
Secondary.
2.3.9
Transformer Ratios Menu
2.3.9.1
View/Edit Settings
TRANS. RATIOS
Password protected window for “TRANS. RATIOS settings :
Phase CT Primary, Phase CT Secondary, E/F CT Primary and E/F CT
Secondary.
Phase CT Primary
100 A
Editable setting
By using the (
5
) or (
6
) key, Phase CT Primary can be set. The
setting range is from 1A to 30000A step 1A.
Phase CT Sec’y
1 A
Editable setting
By using the (
5
) or (
6
) key, Phase CT Secondary can be set as 1A /
5A.
E/F CT Primary
100 A
Editable setting
By using the (
5
) or (
6
) key, E/F CT Primary can be set. The setting
range is from 1A to 30000A step 1A.
E/F CT Secondary
1 A
Editable setting
By using the (
5
) or (
6
) key, E/F CT Secondary can be set as 1A / 5A.
2.3.10
Record Control Menu
2.3.10.1
View/Edit Settings
RECORD CONTROL
Password protected window for “RECORD CONTROL’’ settings :
Clear Events (Yes/No), Clear Faults (Yes/No), Clear Dist Recs (Yes/No),
Clear Maint (Yes/No), Thermal Reset (Yes/No).
Summary of Contents for Agile P153
Page 3: ...P50 Agile P153 1 Introduction P153 EN M B 1 1 INTRODUCTION CHAPTER 1 ...
Page 4: ...1 Introduction P50 Agile P153 1 2 P153 EN M B ...
Page 10: ...1 Introduction P50 Agile P153 1 8 P153 EN M B ...
Page 11: ...P50 Agile P153 2 Safety Information P153 EN M A 2 1 SAFETY INFORMATION CHAPTER 2 ...
Page 22: ...Chapter 2 Safety Information P50 Agile P153 2 12 P153 EN M A ...
Page 23: ...P50 Agile P153 3 Hardware Design P153 EN M B 3 1 HARDWARE DESIGN CHAPTER 3 ...
Page 24: ...3 Hardware Design P50 Agile P153 3 2 P153 EN M B ...
Page 32: ...3 Hardware Design P50 Agile P153 3 10 P153 EN M B ...
Page 33: ...P50 Agile P153 4 Front Panel P153 EN M B 4 1 FRONT PANEL CHAPTER 4 ...
Page 34: ...4 Front Panel P50 Agile P153 4 2 P153 EN M B ...
Page 39: ...P50 Agile P153 5 Configuration P153 EN M B 5 1 CONFIGURATION CHAPTER 5 ...
Page 40: ...P50 Agile P153 5 Configuration P153 EN M B 5 2 ...
Page 150: ...P50 Agile P153 5 Configuration P153 EN M B 5 112 ...
Page 151: ...P50 Agile P153 6 Protection Functions P153 EN M B 6 1 PROTECTION FUNCTIONS CHAPTER 6 ...
Page 152: ...6 Protection Functions P50 Agile P153 6 2 P153 EN M B ...
Page 168: ...7 Protection Parameter Settings P50 Agile P153 7 2 P153 EN M B ...
Page 189: ...P50 Agile P153 8 Monitoring Control P153 EN M B 8 1 MONITORING CONTROL CHAPTER 8 ...
Page 190: ...8 Monitoring Control P50 Agile P153 8 2 P153 EN M B ...
Page 207: ...P50 Agile P153 9 SCADA Communications P153 EN M B 9 1 SCADA COMMUNICATIONS CHAPTER 9 ...
Page 208: ...12 SCADA Communications P50 Agile P153 9 2 P153 EN M B ...
Page 220: ...12 SCADA Communications P50 Agile P153 9 14 P153 EN M B ...
Page 221: ...P50 Agile P153 10 Installation P153 EN M B 10 1 INSTALLATION CHAPTER 10 ...
Page 222: ...10 Installation P50 Agile P153 10 2 P153 EN M B ...
Page 234: ...13 Commissioning Instructions P50 Agile P153 13 2 P153 EN M B ...
Page 242: ...12 Maintenance and Troubleshooting P50 Agile P153 12 2 P153 EN M B ...
Page 250: ...12 Maintenance and Troubleshooting P50 Agile P153 12 10 P153 EN M B ...
Page 252: ...13 Technical Specifications P50 Agile P153 13 2 P153 EN M B ...
Page 263: ...P50 Agile P153 14 Wiring Diagrams P153 EN M B 14 1 WIRING DIAGRAMS CHAPTER 14 ...
Page 264: ...14 Wiring Diagrams P50 Agile P153 14 2 P153 EN M B ...
Page 267: ......