
P50 Agile P153
8 Monitoring & Control
P153/EN M/B
8-9
Function
Description
StrtIN1>3
Start Measured E/F stage 3
StrtIN2>1
Start Derived E/F stage 1
StrtIN2>2
Start Derived E/F stage 2
StrtIN2>3
Start Derived E/F stage 3
Strt BC
Start Broken Conductor
Strt THOL
Start Thermal Alarm
Strt CLP
Start Cold load Pickup
Strt I<
Start Under current
Strt CBF
Start Breaker Failure
I> BCBF
Block O/C protection during CB Fail
IN1> BCBF
Block E/F protection during CB Fail
BC Alarm
Broken Conductor Alarm
CloseFail
CB Close Fail Alarm (during control operation)
Open Fail
CB Open Fail Alarm (during control operation)
Rly OK
Relay healthy
Gen Trip
General Trip
Trip L1
Trip in phase A
Trip L2
Trip in phase B
Trip L3
Trip in phase C
Trip I>1
Trip in O/C stage 1
Trip I>2
Trip in O/C stage 2
Trip I>3
Trip in O/C stage 3
Trip I2>1
Trip in Neg seq. O/C stage 1
Trip I2>2
Trip in Neg seq. O/C stage 3
Trip I2>3
Trip in Neg seq. O/C stage 2
TripIN1>1
Trip in Measured EF stage 1
TripIN1>2
Trip in Measured EF stage 2
TripIN1>3
Trip in Measured EF stage 3
TripIN2>1
Trip in Derived EF stage 1
TripIN2>2
Trip in Derived EF stage 2
TripIN2>3
Trip in Derived EF stage 3
Trip BC
Trip in Broken Conductor
THOL Trip
Trip in Thermal overload
CLP
Trip in Cold load pickup
Trip I<
Trip in Under Current
CBF Trip
Trip in Breaker Fail
CBOpenAlr
CB operation Alarm
OptoI/P 1
Opto Input 1
OptoI/P 2
Opto Input 2
OptoI/P 3
Opto Input 3
OptoI/P 4
Opto Input 4
AndLogicA
AND logic equation A
AndLogicB
AND logic equation B
AndLogicC
AND logic equation C
Summary of Contents for Agile P153
Page 3: ...P50 Agile P153 1 Introduction P153 EN M B 1 1 INTRODUCTION CHAPTER 1 ...
Page 4: ...1 Introduction P50 Agile P153 1 2 P153 EN M B ...
Page 10: ...1 Introduction P50 Agile P153 1 8 P153 EN M B ...
Page 11: ...P50 Agile P153 2 Safety Information P153 EN M A 2 1 SAFETY INFORMATION CHAPTER 2 ...
Page 22: ...Chapter 2 Safety Information P50 Agile P153 2 12 P153 EN M A ...
Page 23: ...P50 Agile P153 3 Hardware Design P153 EN M B 3 1 HARDWARE DESIGN CHAPTER 3 ...
Page 24: ...3 Hardware Design P50 Agile P153 3 2 P153 EN M B ...
Page 32: ...3 Hardware Design P50 Agile P153 3 10 P153 EN M B ...
Page 33: ...P50 Agile P153 4 Front Panel P153 EN M B 4 1 FRONT PANEL CHAPTER 4 ...
Page 34: ...4 Front Panel P50 Agile P153 4 2 P153 EN M B ...
Page 39: ...P50 Agile P153 5 Configuration P153 EN M B 5 1 CONFIGURATION CHAPTER 5 ...
Page 40: ...P50 Agile P153 5 Configuration P153 EN M B 5 2 ...
Page 150: ...P50 Agile P153 5 Configuration P153 EN M B 5 112 ...
Page 151: ...P50 Agile P153 6 Protection Functions P153 EN M B 6 1 PROTECTION FUNCTIONS CHAPTER 6 ...
Page 152: ...6 Protection Functions P50 Agile P153 6 2 P153 EN M B ...
Page 168: ...7 Protection Parameter Settings P50 Agile P153 7 2 P153 EN M B ...
Page 189: ...P50 Agile P153 8 Monitoring Control P153 EN M B 8 1 MONITORING CONTROL CHAPTER 8 ...
Page 190: ...8 Monitoring Control P50 Agile P153 8 2 P153 EN M B ...
Page 207: ...P50 Agile P153 9 SCADA Communications P153 EN M B 9 1 SCADA COMMUNICATIONS CHAPTER 9 ...
Page 208: ...12 SCADA Communications P50 Agile P153 9 2 P153 EN M B ...
Page 220: ...12 SCADA Communications P50 Agile P153 9 14 P153 EN M B ...
Page 221: ...P50 Agile P153 10 Installation P153 EN M B 10 1 INSTALLATION CHAPTER 10 ...
Page 222: ...10 Installation P50 Agile P153 10 2 P153 EN M B ...
Page 234: ...13 Commissioning Instructions P50 Agile P153 13 2 P153 EN M B ...
Page 242: ...12 Maintenance and Troubleshooting P50 Agile P153 12 2 P153 EN M B ...
Page 250: ...12 Maintenance and Troubleshooting P50 Agile P153 12 10 P153 EN M B ...
Page 252: ...13 Technical Specifications P50 Agile P153 13 2 P153 EN M B ...
Page 263: ...P50 Agile P153 14 Wiring Diagrams P153 EN M B 14 1 WIRING DIAGRAMS CHAPTER 14 ...
Page 264: ...14 Wiring Diagrams P50 Agile P153 14 2 P153 EN M B ...
Page 267: ......